Confusing risk level slider - revamp (possibly into checklist?)

It has 12 possible states, and yet the descriptions only state 6.

  1. Automatically runs high risk commands (e.g. deletions, potential data loss). You feelin' lucky, pun

  2. Automatically runs moderate risk commands where data loss is possible if mistakes are made (e.g. file modification

  3. Automatically runs certain modifications (e.g. renaming files)

  4. Only automatically runs benign, informational or basic modification commands (default)

  5. Only automatically runs benign or informational commands

  6. Substage will always ask for confirmation



I believe a checklist could be an alternative. (exact appearance idrk)

Ex:


☑️ Always keep the original file (Any changes prompted to the file will result in a new file that has the modifications

☑️ Always run with confirmation (If this is checked, all other boxes and text will be greyed out

Automatically run the following commands:

  • ☑️ Benign or informational commands

  • ☑️ Basic modification commands

  • ☑️ Renaming of files

  • ☑️ Moderate risk commands where data loss is possible (e.g. file modification)

  • ☑️ High risk commands including deletions

Please authenticate to join the conversation.

Upvoters
Status

Planned

Board
💡

Feature Request

Date

2 months ago

Author

lionheo9

Subscribe to post

Get notified by email when there are changes.